A'Hearn Project

Overview
Our 100% owned AHearn VMS Project contains high-grade volcanogenic massive sulphide mineral targets explored by SLAM Exploration Ltd. These resource zones are part of the SLAM's mineral property holdings situated within the historical and metal-rich Bathurst Mining Camp in New Brunswick, Canada.
Project Highlights
A'Hearn is situated directly adjacent to our Mine Road project, containing the Railroad zone, which is adjacent to the former Heath Steele Mine. This includes hole IL14-03 consisting of a 9.0-meter core interval grading 14.51% Zn, 5.86% Pb, 139.9 g/t Ag, and 0.67% Cu.
A'Hearn is comprised of Zones A & B, with Zone A drill intercepts exhibiting up to 29.1% zinc, 16.6% lead, 2.26% copper and 210.34 g/ton silver over 1.5m true thickness (DDH OH-34 file 472948). The A Zone is 152m long
at surface and extends 366 m down plunge and dips 65 degrees east.
The Strachens East Deposit has the deepest hole at the project, which yielded 6.18% zinc, 0.16% copper, 0.75% lead, and 12.4 g/t silver over 3.35 m at a vertical depth of 365 m.
