MINE ROAD PROJECT
Zinc, Copper, Lead, Silver

Previous workers cut 14.51% zinc, 0.67% copper, 5.86% lead and 139.9 g/t silver over a 9.0 metre core interval in diamond drill hole IL2014-003 on the Railroad Zone. The Mine Road Project covers 7247 hectares of volcanogenic massive sulphide (VMS) strata adjacent to the former Heath Steele Mines property. Seven VMS zinc, copper, lead, silver occurrences are located within the Mine Road claim boundary.