SLAM EXPLORATION

The Upper Road Zone:

New VMS Drilling Discovery PZ18-01.

3,000 m from  Restigouche deposit.

Trevali plans production at Restigouche.

Hole PZ18-01 Drilling Video

The Upper Road Zone In Hole PZ18-01.

12.61% zinc, 12.94% lead,

0.21% copper, 133 g/tonne silver,

Over a core length of 1.35 m.

Open down-dip and along strike.

Recent New  Boulder Discoveries.

Contain zinc, lead, copper and silver.

Mineralized float spread along ridge

3500 m south of Upper road zone.

Click BMC  for details.

The Bathurst Mining Camp (“BMC”).

 BTV-Business Television,  on BNN.

View BNN Clip .

The Menneval Gold project.

SLAM Exploration © 2014 Frontier Theme